Sodrugestvo in Russia
More info >>
The Terminal operates 9 berths.
Allows for simultaneous handling of 6 vessels with daily cargo turnover of up to 70,000 tons of vegetable oils and grains.
Total annual processing volume:
- Soybeans – 2,064,000 tons per year \ or
- Sunflower seeds – 1,858,000 tons per year \ or
- Rapeseeds – 1,376,000 tons per year \ or
- Linseeds – 1,032,000 tons per year
The largest oilseeds processing complex in Eastern Europe.
More info >>
Belgorod 308000
phone.: +7 (472) 227 86 24
E-mail: trade@sodrugestvo.ru
tel.: +7 4012 30 55 42
fax: +7 4012 30 61 42
E-mail: trade@sodrugestvo.ru
Moscow 115054
phone.: +7 (495) 933 60 77
E-mail: trade@sodrugestvo.ru
Tashkent Uzbekistan
phone.: +99 890 1884507
E-mail: o.yakubov@sodru.com
Nizhny Novgorod 603000
phone.: +7 (831) 274 64 48
E-mail: e.goschanskiy@sodrugestvo.ru
St. Petersburg 194044
phone.: +7 (812) 688 89 99
E-mail: v.koshechkin@sodrugestvo.ru
Krasnodar 350000
phone.: +7 861 219 50 82
E-mail: r.konogray@sodrugestvo.ru
he ALC is adjacent to Achinsk-1 railway station and is designed according to the scheme “truck-railcar” for fast acceptance from trucks and loading to railcars.
More info >>
The Center provides services of acceptance, cleaning/drying, storage, loading to trucks and railcars.
More info >>
Total length of the railway tracks of the Railway complex is over 16 km, it includes 25 internal tracks.
The length of the approach line from the Complex to Kastornaya Novaya station of the South-Eastern Railways is over 2 km.
More info >>
Total length of the railway tracks is over 26 km.
Owns an extensive network of approach lines with high-speed stations for railcar loading and unloading, which enables the entire Complex to handle 6 trains per day for acceptance and shipment of grain-hoppers and up to 2 tank-car trains with vegetable oils.
More info >>
The ALC is directly adjacent to the Karbyshevo-II railway station and is designed according to the scheme “truck-railcar" for fast acceptance from trucks and loading to railcars.
More info >>
The Center is directly adjacent to the railway station Pozdeevka and designed according to the scheme “truck-railcar” for fast acceptance from trucks and formation of shipments with total amount up to 64 000. tons at a time, to be further loaded to railcars.
More info >>
More info >>
Total storage capacity is up to 55,000 tons.
More info >>
Transshipment capacity is 70,000 tons per year.
More info >>
Total storage capacity is up to 40,000 tons
More info >>
More info >>
More info >>